Monday, 13 January 2014

Semington Dry Dock

Another lovely day as I left Sells Green.
A gap at Sells Green for someone else.
The first swing bridge you come across is a challenge for a single-hander as there is no landing space on the far side. I had to 'rope' the bridge and pull it back. Interesting.
Long shadows in the winter sunshine
Between Sells Green and Semington Drydock there are five swing bridges and six locks.
Arrived at Semington Dry Dock
 
'Constance' will be going into the middle dock.
Arrived ready for dry-docking, hull inspection and blacking.

No comments:

Post a Comment