That said, the bathroom shelving is now finished.
There is space in the bottom shelf for one of the loo cassettes to sit out of the way.
Two upper shelves and a lower shelf for the spare loo cassette |
Loo cassette on the shelf at the back and one stood in front. All neatly stowed away and still space for 'loo blue' etc. The dark grey is the engine cooling tank and I have noticed that the engine is not getting quite as warm as it was and the swim tank warms. This suggests to me that the engine's thermostat has failed. Another job to do...
With the loo in front as it was before. All of the engine room spaces are now blocked off so the engine fumes should not be so strong whilst the engine is running. There is now plenty of room on the upper shelves for all the normal 'bathroom' things - wash-bags, soap, shampoo and spare loo rolls.
I am still in the area just to the north of the city of Oxford. David comes to see me every time I come up to Constance and we have a meal together, then do all of the puzzles in the 'i' newspaper.